Parents' Association Outdoor Play Structure

During the summer, the new outdoor play structure, funded by the Parents' Association began to take shape.

The idea came from the sense that, while the younger children had structures to play on, there wasn't a structure specifically for the older pupils in our school.

There was consultation with the older pupils, staff and Parents' Association members in advance of the plan for the play structure, drawn up by Silvabuild, a company in Cork. Pupils wanted a structure that could accommodate lost of children at the same time, had a platform at height and could be used as a base or den for games, such as tip the can. The children also wanted to retain the tunnel and hill that was in the area already. The area for the structure is quite small which created some limitations.

Site before works with hill and tunnel on the right
The proposed structure with a slide, net and climbing wall using a tree trunk

1. The first job was to strip the sod off the top of the ground, move the tunnel and relocate it beside where the new structure was going in. 2. The sods were then relaid on top of the soil making up the new hill above the tunnel.

The tunnel and hill taken off the site area
Tunnel moved beside the back wall with a new hill.

  1. Next, all of the soil had to be removed to a depth of 20 cm and two trenches were dug that were filled with concrete foundations to keep the structure stable.
Two trenches dug by Tony Daly. Many thanks to him for volunteering his time to complete the groundworks.
Foundations in place
Site with hill and tunnel and hill moved, soil dug out and foundations in place.
  1. Once the foundations were in place, the space between the two foundations was dug out and filled with stone, as it was going to be underneath something very heavy.
Stone being placed between the two concrete foundations
Stone in place between the foundations
  1. The stone was needed because the structure being placed between the foundations was a cedar tree, sourced in Co. Cork. One side of the tree trunk was sawn flat to be used as a way to climb up on the platform of the play structure.
Cedar tree being cut in Co. Cork.
  1. Finally, the play structure arrived. First, the slide arrived from Denmark.
Slide coming in on the teleporter, thanks to Aidan McMenamon, building contractor of the Slane Community Centre.
Play structure being assembled on site
Play structure with tree being placed in position.
  1. Once in position approximately, the structure began to be assembled.
Structure frame with tree trunk in position
Site with outdoor structure and tree trunk in position.
Structure with roof and slide being assembled.

Completed play structure showing sides with ladder and cedar tree climbing section on wood chip mulch
Completed structure showing sides with slide and cargo net on wood chip mulch

You can see a short video of the complete structure in this short YouTube video above